CODE OF PRACTICE Second Edition - 21 May 1999
|
CONTENTS |
||
| Parts |
Paragraph
|
|
| I | GENERAL |
1-2
|
| II | INTERPRETATION |
3
|
| III | CONDUCT OF LAND BOUNDARY SURVEYS |
4-40
|
| (A) Field notes |
4-8
|
|
| (B) Origin of co-ordinates & bearings |
9-12
|
|
| (C) Bearings, distances and co-ordinates |
13-16
|
|
| (D) Survey instruments |
17-19
|
|
| (E) Traverses |
20-27
|
|
| (F) Boundary marking |
28-33
|
|
| (G) Permanent survey marks |
34-35
|
|
| (H) Physical features |
36-38
|
|
| (I) Survey Report |
39-40
|
|
| IV | MEASUREMENTS AND SURVEY TOLERANCES |
41-42
|
| V | LAND BOUNDARY PLANS |
43-44
|
| VI | SURVEY RECORD PLANS |
45-46
|
| VII | DESIGNATIONS OF SUBDIVIDED LOTS |
47-56
|
| APPENDIX A | SPECIFICATIONS FOR SURVEY MARKS | |
| APPENDIX B | DRAUGHTING SPECIFICATIONS FOR SURVEY RECORD PLANS | |
| APPENDIX C | SPECIMEN LAND BOUNDARY PLAN | |
| APPENDIX D | SPECIMEN SURVEY RECORD PLAN | |
| APPENDIX E | A SUMMARY OF THE AMENDMENTS MADE SINCE THE PUBLICTATION OF THE FIRST EDITION | |
| III | CONDUCT OF LAND BOUNDARY SURVEYS |
|
In order to maintain a uniform standard practice for all land boundary surveys, Authorized Land Surveyors are required to adhere to the following regulations:- |
|
| (A) | Fields notes |
| 4. |
The first page of the field notes of every survey shall bear the certificate signed by the Authorized Land Surveyors in the following form: |
|
I , .................................. , an Authorized Land Surveyor registered under the Land Survey Ordinance (Cap. 473), hereby certify that these field notes, consisting of ........ pages, are a correct and complete record of the observations and measurements made in the field, either by me, or under my immediate direction and supervision. |
|
|
I also certify that the land boundary survey, of which the field notes form a part, was carried out in conformity with the Code of Practice approved by the Land Survey Authority under the above Ordinance, and that the survey was completed on the ........day of .........., 19..... |
|
| Dated this ........day of.............19..... | |
| ........................................... | |
| Authorized Land Surveyor | |
| 5. |
An Authorized Land Surveyor or his assistants who carry out the land boundary surveys shall initial and date each page of the field notes. Where an assistant is carrying out the survey under the direction of an authorized land surveyor the latter or his delegate will additionally initial and date those pages of the field notes where the survey has been tested or otherwise checked by him and/or, other field instruction has been given. |
| 6. |
Field notes shall be prepared for all land boundary surveys performed under the Ordinance and should be a complete original record of all field observations and field measurements recorded in the field. Printout from electronic data recorder shall bear the signature of the surveyor and shall contain equivalent information as contained in traditional field notes. Hand-written field notes shall be neatly and clearly recorded or annotated in permanent blue or black ink and shall not be obliterated, inked over or erased. Corrections may only be made by crossing out the erroneous entry in such a way that it remains legible, and writing the correct value above or alongside it. |
| 7. |
Field notes shall record the type and identification number of the instruments including theodolite, electronic distance meter (EDM) and steel tape etc. used for the survey. The first page shall show the designation of the land parcel, locality or such other reference or legal descriptions. The date of starting and completing the survey shall also be recorded. |
|
8. |
All field notes and computations shall be properly kept for submission upon request by the Land Survey Authority. |
| Origin of co-ordinates & bearings | |
|
9. |
The origin of co-ordinates and bearings shall be obtained from :- |
|
(a) The Hong Kong
Control Survey System, or |
|
|
10. |
The reliability of any two survey stations used for an origin of bearings shall be proved by testing their agreement with at least one other survey station. |
|
11. |
Any one of the survey station proven reliable as in paragraph 10 above shall be acceptable as an origin of co-ordinates. |
|
12. |
The survey tolerances stated in part IV shall be used when proving origins and obtaining agreements with old survey work in the field. |
| (C) | Bearings, distances and co-ordinates |
| 13. |
Bearings shall be measured with a theodolite reading to 20 seconds or better precision. Traverse bearings shall be made with a minimum of one arc on both face left and face right of the theodolite. |
| 14. |
Bearings shall be recorded in the field notes in accordance with the precision of the theodolite being used and shown on survey record plan and land boundary plan to the nearest 10 seconds. To facilitate the use of computer in computation and plan production, bearings may be shown on land boundary plan and survey record plan to the nearest 1 second without rounding off the figures. |
| 15. |
Distances shall be shown in metres and decimals of a metre and read and booked in the field to 0.001 of a metre. Distance measurements shall be made with a steel tape or an electronic distance meter (EDM). All necessary corrections shall be applied. |
| 16. |
Distances and co-ordinates shall be shown on survey record plans to 0.001 of a metre but shall be shown on the land boundary plan to the nearest 0.01 of a metre. To facilitate the use of computer in computation and plan production, distances and coordinates may also be shown on land boundary plan to the nearest 0.001 of a metre without rounding off the figures. |
| (D) | Survey instruments |
| 17. |
Distance measuring instruments include steel tape and electronic distance meter (EDM). Steel tape shall be checked against an adopted baseline, which is established by the Land Survey Authority, at intervals not exceeding 6 months, or immediately following repair. EDM instruments shall also be checked against an adopted baseline established by the Land Survey Authority annually or immediately following servicing. |
| 18. |
A full report of each calibration shall be kept by the Authorized Land Surveyor for record purposes, and shall be presented for inspection when required by the Land Survey Authority. |
| 19. |
The Land Survey Authority may also inspect instruments used for a land boundary survey to ascertain they are in an operating condition to the satisfaction of the Land Survey Authority. |
| (E) | Traverses |
| 20. |
Traverses shall start from and close onto control survey stations of the Hong Kong Control Survey System or traverse survey stations established in previously land boundary surveys as shown on deposited survey record plans. Before any traverse begins, the reliability of any two survey stations used for an origin should be proved by the Authorized Land Surveyor testing their agreement with at least a third survey station. |
| 21. | No unclosed traverses are allowed. |
| 22. |
Control survey stations emplaced and mathematically fixed by the Survey and Mapping Office of Lands Department are normally in the form of concrete pillars, picket boxes and urban survey marks, and they are collectively described as control survey stations. |
| 23. |
Traverse survey stations shall be marked by one of the following survey marks, details for which are specified at Appendix A:- |
| (a) Iron
tubes; (b) Lead plugs; (c) Iron spikes; (d) Survey nails; (e) Wooden pegs; or (f) Cut marks. (cut marks shall only be used where other marks cannot be emplaced) |
|
| 24. |
Angular misclosure
for a traverse shall not exceed (30 |
| 25. |
Linear misclosure for a traverse shall not exceed (10 + 2S/15) millimetres where S is the total length of the traverse in metres. |
| 26. |
When a traverse longer than 1.5 km. is run, control bearings shall be observed reciprocally between traverse survey stations and some other control survey stations, at such station intervals as will adequately control the orientation of the traverse lines. The number of traverse survey stations between control bearings shall not be more than fifteen. In special situations and where there is no practical alternative, the Land Survey Authority may approve the use of a single ray, observed to a distant control survey station, to control the orientation of the traverse lines. |
| 27. | Traverse misclosures shall be mathematically adjusted. |
| (F) | Boundary marking |
| 28. |
Boundaries shall be marked at every corner, and where necessary at points on the boundary line if the corners are not intervisible. |
| 29. |
Where a boundary mark cannot be placed because of an obstruction the boundary mark position shall be offset for establishing its position in future. |
| 30. |
Boundary marks shall be one of the following survey marks, details for which are specified at Appendix A:- |
| (a) Iron
tubes; (b) Lead plugs; (c) Iron spikes; (d) Survey nails; (e) Wooden pegs; or (f) Cut marks. (cut marks shall only be used where other marks cannot be emplaced) |
|
| 31. |
Every boundary mark shall be placed by bearing and distance from a survey station and checked independently by radiation from another survey station. Where double radiation is impracticable other checking method will be used to verify the accuracies intended. The same requirements apply when fixing the position of old marks, occupation and other elements essential to land boundary definitions. |
| 32. |
The setting out distance from a survey station to a boundary mark using steel tape and EDM shall not exceed 20 metres and 150 metres respectively. They must be checked independently and recorded accordingly. |
| 33. |
Curved boundaries shall be marked at both end points and at least one other point on the curve. In addition, curves shall be marked at intervals not exceeding 15 metres, measured along the chord. |
| (G) | Permanent survey marks |
| 34. |
At least two permanent survey marks (PSMs) shall be established for every land boundary survey in accordance with specifications at Appendix A. Where there are existing PSMs from previous land boundary surveys in the vicinity, they may be accepted as PSMs after verification. No boundary mark shall be at a greater distance than 100 metres from a PSM. |
| 35. |
All PSMs shall be fixed by double radiation. They shall be described with sketches in the field notes and shown on the survey record plan as to the type of survey mark and its position and height above ground level. |
| (H) | Physical features |
| 36. |
The positions of all buildings or prominent physical features, on or within 0.5 metre of a boundary line, shall be surveyed, calculated and shown as offsets on the survey record plan. Physical features beyond this and up to 3 metres need only be shown graphically. |
| 37. |
Boundary on party wall shall have the offset distances in relation to the party wall shown on the survey record plan. |
| 38. |
Where a boundary is located in a party wall, or between abutting walls, checks must be carried out to confirm that the line of the party wall or the line between abutting wall is a straight line. |
| (I) |
Survey Report |
| 39. |
The Authorized Land Surveyor shall submit a survey report giving the rationale of how the boundaries are established for every land boundary survey. The report should contain information regarding the evidence found and include a copy of any Land Boundary Plan, Survey Record Plan, Identification Plan, Control Traverse and any other plan, sketch, photograph or document containing information or data, which have been used or based on for traverse origin and/or boundary definition or redefinition. |
| 40. |
Evidence as referred to in paragraph 39 above may include relevant information obtainable from records (such as Demarcation District (DD) sheets, DD Control sheets, DD Enlargement, House Lot Plans, House Lot Plans Retrace, "A" sheet, Cadastral Survey Plans, DD Lot Identification Plan (I plan), Permanent Land Record Plan, Survey Record Plans (SRP), SRP equivalent data, Land Boundary Plans, Aerial photographs, Survey Sheets from Microfilm), as well as ground occupation and investigation, interviews and any other form of data that will support the position and dimensions of the lot under survey. |
| IV | MEASUREMENTS AND SURVEY TOLERANCES | ||||
| 41. |
If a bearing, a distance or an area is remeasured or re-calculated for verification, re-establishment or whatever reasons, discrepancies are acceptable if they are within the listed tolerances below. The original values will then be adopted. If the discrepancies fall outside these tolerances the new values must be conclusively checked for correctness. If confirmed, the original values must be considered as superseded by the new values with reasons clearly recorded. The tolerances are: |
||||
| (1) Survey tolerances - Bearing measurements: | |||||
|
Distance |
Tolerance |
||||
| under 15 m | (+/-) 2' 00" | ||||
| 15 m - 150 m | (+/-) 1' 00" | ||||
| Over 150 m | (+/-) 0' 30" | ||||
|
(2) Survey tolerances - Distance measurements: |
|||||
|
|||||
|
(3) Survey tolerances - Area calculations: |
|||||
| Tolerance: | (+/-) 0.1 % | ||||
| 42. |
Areas shall be rounded off to the nearest unit as follows: |
||||
| Area of Lot | Expressed in | Rounded off to nearest | |||
| Under 2000 m2 | m2 | 0.1 m2 | |||
| 2000 m2 and above | m2 | 1 m2 | |||
|
However, areas already committed may be exempted from this rule, in which case the tolerance in paragraph 41(3) will apply. All areas shown on plans shall be qualified with the word "about". |
|||||
| V | LAND BOUNDARY PLANS | |
| 43. |
For the purpose of this Ordinance, a land boundary plan shall be prepared for division of land for attachment to the instrument for registration with Land Registry under the Land Registration Ordinance (Cap. 128). In addition, duplicate copy of the land boundary plan and survey record plan shall also be deposited with the Land Survey Authority. |
|
| 44. | The land boundary plan shall satisfy the following requirements: | |
|
||
|
||
|
||
|
||
|
||
.......................................... |
||
| VI | SURVEY RECORD PLANS |
| 45. |
The survey record plan (SRP) is a plan which records survey data (including land boundaries, survey evidence, survey marks, traverses, alignments and significant ties to occupation and related features) used in a land boundary survey. The objectives of preparing a SRP are:
|
| 46. | The
survey record plan shall include the following information:
........................................... |
| VII | DESIGNATIONS OF SUBDIVIDED LOTS | |||
| 47. |
For the purpose of this Ordinance, the resultant parcels of land when a lot is subdivided shall be designated in accordance with the following practice. It is essential that a standardized system of designations and abbreviations is adopted so that the subdivided lots can be unambiguously and easily identified. |
|||
| 48. |
When a lot is subdivided for the first time, the subdivided portions are called "Sections" which shall be designated with letters in alphabetical order successively as Section A, Section B, Section C etc. except for the last section which shall be designated as the Remaining Portion of the original lot (see Example 1). There shall be no skipping in the sequence of the letters (the letters I and O shall also be used). If Z is reached then the sequence shall be continued by prefixing A to the letter, then B, and so on, e.g. Section Z, Section AA, Section AB etc. |
|||
|
Example 1: First Subdivision of Lot 123
|
||||
| 49. |
In a subsequent subdivision of a section, the subdivided portions are called "Subsections" which shall be designated with numbers successively as Subsection 1, Subsection 2, Subsection 3 etc. except for the last subsection which shall be designated as the Remaining Portion of the original section (see Example 2). |
|||
| Example
2: Subdivision of Section A of Lot 123
|
||||
| 50. |
On further subdivisions of a section or a subsection into the next tiers, the key to the designations is that a section is followed by a subsection which in turn followed by a section, ad infinitum. The last portions shall always be designated as the Remaining Portion of the original section/subsection. Sections are labelled by using letters and subsections are labelled by using numbers (see Example 3). |
|||
|
Example 3: Subdivision of Subsection 1 of Section A of Lot 123
|
||||
| 51. |
If the Remaining Portion of a lot, a section or a subsection is further subdivided, the subdivided portions become additional sections or subsections of the original lot/section/subsection. For new sections, they shall be labelled alphabetically with the letter sequence following on from the letters used in the previous subdivision (see Example 4). For new subsections, they shall be labelled by numbers following on from the sequence in the previous subdivision (see Example 5). There shall be no skipping in the sequence of the letters or numbers. The last section or subsection shall be designated as the Remaining Portion of the original lot/section/subsection. |
|||
|
Example 4 : Subdivision of the Remaining Portion of Lot 123
|
||||
|
Example 5 : Subdivision of the Remaining Portion of Section A of Lot 123
|
||||
| 52. |
When a portion of a lot/section/subsection is resumed by the Government, it will not be given any designation. The land parcel with non-designated portion(s) being resumed will become known as the Remaining Portion of the original lot/section/subsection. On subdivision of a remaining portion involving resumed portion(s) with no designation(s), labels for the designations of the subdivided portions shall start with the letter "A" for sections or the number "1" for subsections if the parent lot/section/subsection has not been subdivided before, the new sections/subsections shall be labelled by letters or numbers following on from the letter or number sequence of the designated sections/subsections in the previous subdivision (see Examples 8 and 9). |
|||
|
Example 6: Subdivision of the Remaining Portion of Lot 123 involving resumed portion(s) (Lot 123 has not been subdivided previously).
|
||||
|
Example 7: Subdivision of the Remaining Portion of Section A of Lot 123 involving resumed portion(s) (Section A of Lot 123 has not been subdivided previously)
|
||||
|
Example 8: Subdivision of the Remaining Portion of Lot 123 involving resumed portion(s) with no designation(s) (Lot 123 has been subdivided previously)
|
||||
|
Example 9: Subdivision of the Remaining Portion of Section A of Lot 123 involving resumed portion(s) (Section A of Lot 123 has been subdivided previously)
|
||||
| 53. |
Sections/subsections of a lot created in previous subdivisions may sometimes be amalgamated to form a new parcel of land. The resultant land parcel shall be assigned with new designation except when all the subdivided portions of a lot/section/subsection are involved in the amalgamation, in which case, the original lot/section/subsection will deem to have been "re-established" by means of amalgamation and the original designation shall be adopted. On further subdivision of the re-established lot/section/subsection, the new sections/subsections shall be designated in the manner as described in paragraph 51 above to avoid confusing them with the old sections/subsections which existed prior to amalgamation (see Examples 10 and 11). |
|||
|
Example 10: Amalgamation involving all subdivided portions of Lot 123
|
||||
|
Example 11: Amalgamation involving all subdivided portions of Section A of Lot 123
|
||||
| 54. |
When the amalgamation involves only some of the subdivided portions of a lot/section/subsection, the resultant land parcel will be regarded as a new section or subsection of the original lot/section/subsection depending on the highest level of the subdivided portions in the subdivision tree involved. It will be a section if the highest level of subdivided portions in the amalgamation involves section. It will be a subsection if the highest level of subdivided portions in the amalgamation involves subsections. The resultant land parcel shall be designated as the Remaining Portion of the original lot/section/subsection if the highest level of the subdivided portions in the amalgamation involves the remaining Portion of that lot/section/subsection. On further subdivision of the resultant land parcel, the new sections shall be designated in the manner as described in paragraph 51 above (see Examples 12 and 13). |
|||
|
Example 12: Amalgamation involving some of the subdivided portions of Lot 123 (including the Remaining Portion of Lot 123)
* subdivided portions involved in the amalgamation |
||||
|
Example 13: Amalgamation involving some of the subdivided portions of Lot 123 (including the Remaining Portion of Section A of Lot 123)
* subdivided portions involved in the amalgamation |
||||
| 55. |
If the Remaining Portion of the original lot/section/subsection is not involved in the highest level of the subdivided portions in the amalgamation, the resultant land parcel shall be designated by a letter (for section) or a number (for subsection) following on from the last letter or number used in the previous subdivision at that highest level. On further subdivision of the resultant land parcel, the new sections/subsections shall be designated in the manner as described in paragraphs 49 and 50 (see Examples 14 and 15). |
|||
|
Example 14: Amalgamation involving some of the subdivided portions of Lot 123 (excluding the Remaining Portion of Lot 123)
* subdivided portions involved in the amalgamation |
||||
|
Example 15: Amalgamation involving some of the subdivided portions of Section A of Lot 123 (excluding the Remaining Portion of Section A of Lot 123)
* subdivided portions involved in the amalgamation |
||||
| 56. |
The following abbreviations shall be used for the designations of the subdivided lots shown on survey record plans and land boundary plans. |
|||
| 56. |
The following abbreviations shall be used for the designations of the subdivided lots shown on survey record plans and land boundary plans. |
|||
| (a) | Section | -S. | ||
| (b) | Subsection | -ss. | ||
| (c) | Remaining Portion | -RP | ||
|
e.g. Lot 123 S.O ss.1 S.I RP - The Remaining Portion of Section I of Subsection 1 of Section O of Lot 123 |
||||